#Building and Construction
Tangshan Branch, Nanjing General Hospital of Nanjing Military Command project
S3100 collector
Tangshan Branch, Nanjing General Hospital of Nanjing Military Command is located in Tangshan, an ancient town in scenic spot of eastern suburb, Nanjing City. Tangshan Ancient Town is a national scenic spot and a hot spring tourism development zone in Nanjing. Original site of the Branch was built in 1938. In September 2005, it was renamed to Convalescence Area of Nanjing General Hospital and used for convalescence purpose. With historical changes in nature and function, the Branch starts medical treatment service and gradually becomes a hospital featuring combination of recuperation and treatment, convalescence based on medical treatment and harmonious development by relying on strong medical and technical advantages of Nanjing General Hospital.
Tangshan Branch has a medical area of about 40,000m2, one outpatient building, two comprehensive ward buildings and independent rehabilitation center and physical examination center and is the largest comprehensive medical institution integrating medical treatment, convalescence, rehabilitation and physical examination in the east. At present, it has 18 medical departments, 14 treatment and rehabilitation areas and 605 therapeutic beds. Moreover, the Branch is equipped with such medical devices as magnetic resonance imaging, CT, CR, digital gastrointestinal machine, colorized B ultrasonography and fully automatic biochemical analyzer, with a total value above RMB 40 million. Till now, it has set up such clinical departments as internal medicine, general surgery, orthopedics, rehabilitation, stomatology, ophthalmology and otorhinolaryngology and gynecology.
In this Project, one 10kV subscriber station and two distribution rooms (4 transformers in total) are arranged; 156 non-standard distribution boxes are arranged at all the floors, including two parts, i.e., electricity metering and electric leakage monitoring; the data is firstly acquired with S3100 collector and then transmitted to fire-fighting control background and duty room for metering and electric leakage monitoring respectively.