Posted on 1/4/2016
Nellis Air Force Base, Nevada, hosted a groundbreaking ceremony March 24 for the newest Air Force solar array, a photovoltaic farm named Nellis II
The system, upon completion, will provide 19 megawatts of direct current capacity to the base, making it the largest photovoltaic system in the Department of Defense.
The project, a collaboration between Nellis AFB, Air Combat Command and the Air Force Civil Engineer Center, will be the second industrial-scale array at Nellis AFB. The first, 14-megawatt Nellis I, was ...