Add to favorites

#Product Trends

Eurotunnel Project

OPzV VRLA battery,Telecom battery,2V GEL Lead acid battery,2V GEL battery,12V GEL battery

The Channel Tunnel, also known as Eurotunnel, is a railway tunnel that connects British Isles to French, and opened on May 1994. It consists of three 51km long parallel tunnels, with a total length of 153km, and the subsea tunnel is 3 x 38km, it is the second longest submarine tunnel and the longest railway tunnel in the world. On May 7, 1994, it was officially opened to traffic after lasted more than 8 years construction, cost about 10 billion pounds (about 15 billion U.S. dollars); it is also the largest construction projects built with private capital in the world.

This tunnel, across the English Channel, has greatly reduced the time from Europe to United Kingdom, it only need 35 minutes for single trip.

The power supply system of subsea tunnel is the core supporting system, so the standby power supply system is always priority for all. Sacred Sun, relying on its local agency, had successfully supplied standby power supply system of subsea tunnel with its core lead-acid battery.

Details

  • Sheng Yang Lu, Qufu Shi, Jining Shi, Shandong Sheng, China
  • Shandong Sacred Sun Power Technology