Add to favorites

#Building and Construction

200MWP Grid-connected Photovoltaic Power Generation Project of Jinchuan Group Co., Ltd.

Switch modules

This project is located in Jinchuan District Jinchang City with a gross capacity of 200MWp, covering more than 5600000 m2, adopting polysilicon battery block generation mode and connected to national grid through converging, inverting and boosting. The total investment for this project is more than USD 310 million . The planned operation time for this project is 25 years with anual average power generation of 305,438,000kWh and annual revenue of more than USD 39 million.

There are more than 200 switch modules applied in this project. Each module can collect 32 channels of switch status. This module is small, easy to be installed, with high protection degree which is suitable for severe environment.

Details

  • Dong Ding Lu, Jiangyin Shi, Wuxi Shi, Jiangsu Sheng, China, 214437
  • Jiangsu Sfere Electric Co.Ltd.

    Keywords